1997
Founded with a five-person team, focusing on the manufacturing of small dies and jigs.
1999
- First factory — Cakung Plant, with 10 personnel.
- Manufacturing small and medium dies and jigs.
2004
- Second factory — Tambun Plant, with 55 personnel.
- Manufacturing small and medium stamping and welding parts.
2012
- Third factory — Jababeka Plant, with 400 personnel.
- Manufacturing medium and large stamping and welding parts.
- Initiated robotic welding for assembly parts (CO₂ welding).
- Relocated dies manufacturing facility to produce large dies.
2015
- Added robotic spot-welding facility to produce large and complex assembly parts.
- Purchased simulation software for tooling development.
2018
- Upgraded CMM facility with the latest-generation FARO Arm and scanner system.
- Enabled reverse engineering and inspection of complex shapes.
2019
- Fourth factory — Tegal Plant, equipped with 11 press machines.
- Manufacturing small and medium stamping and welding parts (manual and robotic).
2021
- Installed a new 3D laser cutting machine.
2024
- Fifth factory — Delta Plant, developed as a dedicated engineering plant for tooling production, supported by a complete range of large, medium, and small CNC machines and laser cutting systems, totalling 28 units.